Vinhedo 2

As part of Latin America’s largest data center complex, Ascenty begins construction of the Vinhedo 2 data center.

Built on the same campus as the Vinhedo 1 data center, and providing the same level of strength and security that our customers have grown accustomed to, the new data center will expand the region’s capacity to meet local demand.

FOR MORE INFORMATION OR SCHEDULE A TOUR

36 MW

total power

269,000 sq. ft.

total area

4.000

racks

Connectivity

  • Carrier Neutral.
  • Dedicated Telecom meet me rooms.
  • Direct connection with PIX Campinasand PIX São Paulo, and with main cloud providers.

Security

  • 24/7 Monitoring using CCTV cameraswith high-definition automaticmovement detection.
  • Dual authentication for access control using biometric and magnetic cards.

Power

  • Tri-bus redundancy system (three power lines servicing each data hall).
  • Dual diesel fuel storage tanks with 48 hours of fuel autonomy without refueling.

Cooling

  • Isolated technical corridors for equipament maintenance.
  • Dual coil cold water chiller system.

Specifications

Site Power Capacity36.000 kW
Gross Data Center Space269.0977 ft²
UPS RedundancyTribus System – Power Generator+Static UPS (N+1)
Plant Chiller RedundancyN+1 Chilled Water Plant
Data Center StructurePrecast Concrete and Metallic Structure
Seismic RatingZone 0
UPS Power Capacity72.144 kVA
Risk of FloodNo
Maximum Floor Load Capacity1526 kg/m²
Compliance CertificationsTier III
ISO 27001
PCI-DSS
SOC

Vinhedo 2
Strategic Location

Located near the City of São Paulo, the Vinhedo 2 Data Center is the ideal choice for businesses looking for security, scalability and a strategic location to store their data.

Avenida João Batista Nunes, 50- Distrito Industrial Benedito Storani – Vinhedo/SP – CEP 13.288-162